Boral Cement
The Boral Geelong Clinker Grinding Facility, situated in North Shore Geelong, is a crucial component of Boral’s cement production, boasting a processing capacity of up to 1.3 million tonnes annually.
Its electrical installation is fundamental to its operations. Designed for continuous operation, the electrical infrastructure supports a 24-hour, 50-week-per-year schedule, ensuring consistent cement production.
Gordon McKay’s scope of work included:
- Installing five high-voltage (HV) transformers, along with their switchgear, metering, and dedicated switch rooms. It also included the complete low-voltage distribution network, powering motors, conveyors, cooling systems, silos, and all facility lighting
- Installing a comprehensive lighting system to enable 24-hour facility operation while preventing light spill onto surrounding properties. It also included all cable routing and installation, encompassing cable ladders and conduit
- Installing a communications system, including all cabling and equipment installed via underground conduits, cable ladders, and conduits, now supports the plant’s advanced PLCs and SCADA automation, vital for performance and efficiency
- The complete wiring and connection of the dust suppression and noise reduction systems within the plant
- Commissioning
- Development of ITPs and quality assurance frameworks
Gordon McKay was successful in the installation and commissioning of electrical and control equipment ensuring Boral could increase their cement production.

Client
Boral CementLocation
North Shore, GeelongCompleted
February 2023Sector