Future proofing Barwon Water’s infrastructure

In Victoria, to future proof Barwon Water’s infrastructure, a major upgrade was under taken requiring complex coordination of schedules ensuring no disruption to customer’s services while working within tight time frames.
Project works focused on a complete replacement or upgrade of multiple pumping stations. Works included the replacement of motor control centres, programmable logic controllers (PLC), local control equipment, instrumentation, harmonic filters, variable speed dives (VSDs) and back up generation facilities.
A total replacement of the entire telemetry network from the existing analogue equipment to the latest digital technology, from base to field, completed the future proofing.
This project required a flexible approach and constant collaboration with all parties demonstrating Gordon McKay Pty Ltd team’s dedication to customer services.